Robotic Load GCD-level Option
The Robotic Load operation provides the GCD-level option Base Load Time.
Base Load Time
This is the time it takes to pick one non-molded subcomponent of a part and place into the mold or onto an action mechanism. By default, load time is looked up by part weight and load method (see Select Insert Loading Method) in the lookup table tblComponentLoadTime.
With this setup option, users can override the default on a per-subcomponent basis and specify the base load time explicitly.